Freyberg High School Gymnasium Re-clad

The team at PRB are currently underway with a full re-clad contract on the Freyberg High School Gymnasium.

With a lot of trades involved and plenty of materials being moved around on site, it certainly doesnt look like a gym for the students at present.

We are lucky to have the building fully wrapped by the team at Scafit so the weather isnt an issue which helps with the tight time frames in place.

As shown in the photos, there is a lot of scaffolding throughout the building which is helping us to install over 360 sheets of plywood sheeting on the internal walls which has been affected by the leaking cladding.

/ SEE MORE OF WHAT WE CAN DO

All projects